Hello I have been selected to do a routing directorate “early” review of this draft. draft-ietf-bess-datacenter-gateway The routing directorate will, on request from the working group chair, perform an “early” review of a draft before it is submitted for publication to the IESG. The early review can be performed at any time during the draft’s lifetime as a working group document. The purpose of the early review depends on the stage that the document has reached. Document: draft-ietf-bess-datacenter-gateway-10.txt Reviewer: Ravi Singh Review Date: 04/30/2021 Intended Status: Standards Track Summary: No issues found. This documents is ready to proceed to the IESG. Regards Ravi